Quantcast
Viewing all articles
Browse latest Browse all 5402

Bulk Schedule in BO3.1

I had imported 1000+ reports from prod to Dev using import wizard.

this prod reports are scheduled to different destinations and DLs and inboxes.

But I need to run all the reports in Dev to the default location.for this I'm opening all the reports in CMC to change the scedule information to default and  run now as the scheduled information is imported from my prod

 

Is there any smarter way to do this?Using SDKs or using any inbuilt functionality of BO

 

Basically I'm looking to schedule all my reports(WebI +DeskI) in the repository to the default ie)enough to view only in Infoview

 

 

Thanks

Md.Arrif


Viewing all articles
Browse latest Browse all 5402

Trending Articles