Hi Experts,
I have a Webi report which is on top of 2 BEx queries connected through BICS. The Webi report has more than 4 crore records which makes it difficult to load each time when I refresh. I need to schedule this report so that the user can view the report based on the last instance.
The report has 3 prompts namely Plant, Material and As of Date.
The user uses only Plant and As Of Date. There are only two plants for example A and B. The user needs to run the report for each plant separately for all the days.
Suppose today is 03/07/2013.
The user will run the report with Plant A and As of Date: 03/07/2013 and second time with Plant B and As of Date: 03/07/2013.
Next today is 04/07/2013.
The user will run the report with Plant A and As of Date: 4/07/2013 and second time with Plant B and As of Date: 4/07/2013.
I need your expert opinion in achieving this while scheduling. Hope you understood the scenario and will be helping me out in this.
Thanks in Advance,
Abdul