I am using BO4.1 with SP6, I have been asked to use specific colours while creating a piechart, since the report has 3 piecharts I duplicated them by simple copy paste them, and then substituted the measure, but the colour is getting change as soon as I substitute the measure, is there a way I can change the measure by keeping the colours intact?
↧